All worksites will use an eight-person paid trail crew working with experienced Carolina Mountain Club (CMC) volunteer crew members. Work will begin Fall 2024.
Worksite 1, Douglas Falls Trail: tread and drainage maintenance. Repairs: adding steps, installing grade dips, removing roots, widening tread. Three water crossings need armored fords.
Worksite 2, (Appalachian National Scenic Trail (ANST) Little Laurel Shelter overnight site: site drainage maintenance. Repairs: adding steps, water diversions, cribbing/filling cupped areas, removing roots/rocks, widening trail. Bear resistant food storage box will be installed.
Worksite 3, ANST Big Firescald Knob to Round Knob: tread and drainage maintenance. Repairs: adding rock and steps, installing grade dips, filling entrenched tread, removing roots/rocks, widening trail.
Worksite 4, ANST Little Bald to High Rocks: tread and drainage maintenance. Repairs: adding rock and steps, installing grade dips, filling entrenched tread, removing roots/rocks, widening the trail to meet Forest Service standards. All worksites will use an eight-person paid trail crew working with experienced CMC volunteer crew members. Work will begin Fall 2024. Each worksite will take two weeks, except for #3, which requires three weeks.
2024: Highline Trail
2024: Teton Trails Deferred Maintenance
2024: Phase 2 of the Arroyo Hondo Project
2024: Greenhorn Gulch Trail Reroute and Bridge Rebuild
2024: Trail Rehabilitation in Beaverhead Deer Lodge National Forest
2024: Wasatch National Forest Deferred Maintenance and Weather Resilience
2024: Rio Fernando de Taos Watershed Revival
2024: Mineral Creek Trail Reroute
2024: Second Fork Trail Project
2024: Trinity River Watershed Trail Improvement Project
2024: Salmon-Challis National Forest Trail Restoration
2024: Manistee, White, Muskegon, and Pere Marquette River Watershed
2024: Mount Shavano Trail and Riparian Habitat Restoration Project
2024: South Park Ranger District Singletrack Connector Trail
2024: Oak Creek Canyon Watershed Restoration Project
2024: Bartram National Recreation Trail Maintenance
2024: Idaho Panhandle National Forest Sandpoint Ranger District Trail Reroute
2024: Pony Express National Historic Trail Improvement
2024: South Lake and Moss Lake Trail Restoration
2024: West Ridge Trail #176 Improvements
2024: Blue Bend Loop Trail Restoration
2024: Catamount Trail Improvement
2024: Munson Meadow Trail Restoration
2024: Vesuvius Recreation Area Trail System Restoration
2024: Hurricane Creek Trail Restoration
2024: Cove Creek Trail Rehabilitation
2023: The Storm Creek Connector Trail
2023: Backpacker and Lakeshore Trails
2023: Beaver Meadows Trail
2023: Munson Meadow Trail
2023: Imnaha River Trail
2023: Maxon Meadows Trail to Chamberlain Meadows Camp
2023: Lost Lake Trail
2023: Virginia Highlands Horse Trail
2023: Pasayten Wilderness Project
2023: Catawba River Headwaters
2023: Continental Divide National Scenic Trail
2023: Southfork Trail, White Mountain Wilderness
2023: Black Canyon and Trail Creek Drainages
2023: Twenty Lakes Basin Toads and Trails
2023: Dickey Bell Trail Reroute and Bypass
2023: Horseshoe Canyon Trails
2023: Lower San Francisco River Wilderness Study Area
2023: Trails in Ontonagon and Sturgeon watersheds
2023: Bandit Springs Trail System
2023: Caton Lake Trail
2023: Yellowbelly Trail
2023: Santa Cruz Trail
2023: Bridge Replacement for Trail Access
2023: Pioneer Mountains Trail Maintenance
2023: North Country National Scenic Trail Connections
2023: Pincushion Mountain Ski Trails
2023: Rocky Gap Horse Trail System
2023: Shrode Lake Trail
2023: Johnson Creek Trail Re-Establishment
2023: Soda Ditch Loop Trail
2023: Restoration of Buckhorn and Indian Trails
2023: Hauf Lake and One Horse Lakes Trails
2023: Building Resilience on the TRT/PCT
2023: Camp Creek Watershed Improvement
2023: Pomas Creek Trail and Entiat River Trail
2023: Western States Trail & Tevis Cup Trail, within Granite Chief Wilderness
2023: Western States Trail Improvements
2023: Sipsey Wilderness Trails Restoration
325 views • posted 02/06/2024