Trail drainage maintenance will result in a reduction in erosion from trail tread and reduction in sediment delivery to the stream that flows into and out of Farley and Toxaway Lakes, where trails are near or cross it. Functioning drainage and new puncheons will also increase resiliency of the trail to precipitation and runoff. If old puncheons collapse and fail they are not only dangerous to trail users, but the debris can block natural drainage patterns and result in additional erosion. The stream this trail follows is a tributary to Alturas Lake Creek, habitat for anadromous chinook salmon and bull trout, a TES species.
Work on the puncheons will result in fewer hikers and stock users crossing the meadow off the currently unsafe walkway, which results in damage to surrounding riparian vegetation and soils. A functioning walkway will help preserve valuable hydric soils and vegetation. Sawtooth NF, Yellowbelly Trail: maintain drainage features on 5.6 miles of trail between Farley, Petit and Toxaway Lakes. Assist Forest Service in building new puncheon/boardwalks along trail between these lakes (trail is largely within stream corridor/wet meadow habitat). Idaho Conservation Corp is also planned for a week on this project, and ITA will work with them directly or work directly before or after them. The goal for ITA on this project is to rebuild one puncheon and start on a second if time permits in August of 2023, then return in July or August of 2024 to build an additional puncheon, or more than one. This work is anticipated to take 2, 7-day hitches. In total, 19 puncheons must be rebuilt over several years, making this a large effort.
ITA staff will begin recruiting volunteers for this project in the spring of 2023, planning project details and communicating with volunteers leading up to the project. A description of the trip, along with a map, will be posted on our website for prospective volunteers to read before signing up.
2024: Highline Trail
2024: Teton Trails Deferred Maintenance
2024: Phase 2 of the Arroyo Hondo Project
2024: Greenhorn Gulch Trail Reroute and Bridge Rebuild
2024: Trail Rehabilitation in Beaverhead Deer Lodge National Forest
2024: Trail Maintenance and Repairs in Pisgah National Forest
2024: Wasatch National Forest Deferred Maintenance and Weather Resilience
2024: Rio Fernando de Taos Watershed Revival
2024: Mineral Creek Trail Reroute
2024: Second Fork Trail Project
2024: Trinity River Watershed Trail Improvement Project
2024: Salmon-Challis National Forest Trail Restoration
2024: Manistee, White, Muskegon, and Pere Marquette River Watershed
2024: Mount Shavano Trail and Riparian Habitat Restoration Project
2024: South Park Ranger District Singletrack Connector Trail
2024: Oak Creek Canyon Watershed Restoration Project
2024: Bartram National Recreation Trail Maintenance
2024: Idaho Panhandle National Forest Sandpoint Ranger District Trail Reroute
2024: Pony Express National Historic Trail Improvement
2024: South Lake and Moss Lake Trail Restoration
2024: West Ridge Trail #176 Improvements
2024: Blue Bend Loop Trail Restoration
2024: Catamount Trail Improvement
2024: Munson Meadow Trail Restoration
2024: Vesuvius Recreation Area Trail System Restoration
2024: Hurricane Creek Trail Restoration
2024: Cove Creek Trail Rehabilitation
2023: The Storm Creek Connector Trail
2023: Backpacker and Lakeshore Trails
2023: Beaver Meadows Trail
2023: Munson Meadow Trail
2023: Imnaha River Trail
2023: Maxon Meadows Trail to Chamberlain Meadows Camp
2023: Lost Lake Trail
2023: Virginia Highlands Horse Trail
2023: Pasayten Wilderness Project
2023: Catawba River Headwaters
2023: Continental Divide National Scenic Trail
2023: Southfork Trail, White Mountain Wilderness
2023: Black Canyon and Trail Creek Drainages
2023: Twenty Lakes Basin Toads and Trails
2023: Dickey Bell Trail Reroute and Bypass
2023: Horseshoe Canyon Trails
2023: Lower San Francisco River Wilderness Study Area
2023: Trails in Ontonagon and Sturgeon watersheds
2023: Bandit Springs Trail System
2023: Caton Lake Trail
2023: Santa Cruz Trail
2023: Bridge Replacement for Trail Access
2023: Pioneer Mountains Trail Maintenance
2023: North Country National Scenic Trail Connections
2023: Pincushion Mountain Ski Trails
2023: Rocky Gap Horse Trail System
2023: Shrode Lake Trail
2023: Johnson Creek Trail Re-Establishment
2023: Soda Ditch Loop Trail
2023: Restoration of Buckhorn and Indian Trails
2023: Hauf Lake and One Horse Lakes Trails
2023: Building Resilience on the TRT/PCT
2023: Camp Creek Watershed Improvement
2023: Pomas Creek Trail and Entiat River Trail
2023: Western States Trail & Tevis Cup Trail, within Granite Chief Wilderness
2023: Western States Trail Improvements
2023: Sipsey Wilderness Trails Restoration
201 views • posted 05/24/2023