Legacy Trails Program Awardee

 

Greenhorn Gulch Trail Reroute and Bridge Rebuild

This project addresses issues with three bridge sites along the first 0.3 miles of the Greenhorn Gulch Trail.


Applicant: Wood River Trails Coalition
Project Location: Sawtooth National Forest, Idaho
Amount Awarded: $96,000.00

Currently there are three bridge sites along the first .3 miles of the Greenhorn Gulch Trail. The first bridge from the trailhead was removed in the spring of 2023 due to correlated safety concerns after a stringer broke as a result of deferred maintenance and extreme spring weather. The second and third bridges are at or near the end of their useful lifespans. These bridges are in beaver habitat in a consistently moving stream bed. After removing the second lower bridge and closing the trail in the riparian zone, we plan to re-route 0.2 miles of trail along the north side of the creek to the third bridge. This will reduce future maintenance costs with two less bridges and eliminate trail braiding through the wetland. We will rebuild the third bridge with a fully engineered design in a sustainable location. All of this will allow for quality riparian area restoration.


More winners of this award

2024: Highline Trail

2024: Teton Trails Deferred Maintenance

2024: Phase 2 of the Arroyo Hondo Project

2024: Trail Rehabilitation in Beaverhead Deer Lodge National Forest

2024: Trail Maintenance and Repairs in Pisgah National Forest

2024: Wasatch National Forest Deferred Maintenance and Weather Resilience

2024: Rio Fernando de Taos Watershed Revival

2024: Mineral Creek Trail Reroute

2024: Second Fork Trail Project

2024: Trinity River Watershed Trail Improvement Project

2024: Salmon-Challis National Forest Trail Restoration

2024: Manistee, White, Muskegon, and Pere Marquette River Watershed

2024: Mount Shavano Trail and Riparian Habitat Restoration Project

2024: South Park Ranger District Singletrack Connector Trail

2024: Oak Creek Canyon Watershed Restoration Project

2024: Bartram National Recreation Trail Maintenance

2024: Idaho Panhandle National Forest Sandpoint Ranger District Trail Reroute

2024: Pony Express National Historic Trail Improvement

2024: South Lake and Moss Lake Trail Restoration

2024: West Ridge Trail #176 Improvements

2024: Blue Bend Loop Trail Restoration

2024: Catamount Trail Improvement

2024: Munson Meadow Trail Restoration

2024: Vesuvius Recreation Area Trail System Restoration

2024: Hurricane Creek Trail Restoration

2024: Cove Creek Trail Rehabilitation

2023: The Storm Creek Connector Trail

2023: Backpacker and Lakeshore Trails

2023: Beaver Meadows Trail

2023: Munson Meadow Trail

2023: Imnaha River Trail

2023: Maxon Meadows Trail to Chamberlain Meadows Camp

2023: Lost Lake Trail

2023: Virginia Highlands Horse Trail

2023: Pasayten Wilderness Project

2023: Catawba River Headwaters

2023: Continental Divide National Scenic Trail

2023: Southfork Trail, White Mountain Wilderness

2023: Black Canyon and Trail Creek Drainages

2023: Twenty Lakes Basin Toads and Trails

2023: Dickey Bell Trail Reroute and Bypass

2023: Horseshoe Canyon Trails

2023: Lower San Francisco River Wilderness Study Area

2023: Trails in Ontonagon and Sturgeon watersheds

2023: Bandit Springs Trail System

2023: Caton Lake Trail

2023: Yellowbelly Trail

2023: Santa Cruz Trail

2023: Bridge Replacement for Trail Access

2023: Pioneer Mountains Trail Maintenance

2023: North Country National Scenic Trail Connections

2023: Pincushion Mountain Ski Trails

2023: Rocky Gap Horse Trail System

2023: Shrode Lake Trail

2023: Johnson Creek Trail Re-Establishment

2023: Soda Ditch Loop Trail

2023: Restoration of Buckhorn and Indian Trails

2023: Hauf Lake and One Horse Lakes Trails

2023: Building Resilience on the TRT/PCT

2023: Camp Creek Watershed Improvement

2023: Pomas Creek Trail and Entiat River Trail

2023: Western States Trail & Tevis Cup Trail, within Granite Chief Wilderness

2023: Western States Trail Improvements

2023: Sipsey Wilderness Trails Restoration

69 views • posted 02/06/2024