
posted Dec 22, 2020
IMBA Trail Solutions visited the Moose River Plains Wild Forest for one week in October of 2013 to conduct field research, meet with stakeholders, and to begin the process of developing a conceptual design for mountain bike use in the area. All of the designs presented in this report are conceptual in nature and have not been completely field verified. Additional work will need to be done in the field to finalize the designs of reroutes and proposed trails described in this report.
posted Jul 30, 2020
The Sheepskin Trail, a rail-trail project is a proposed 34 mile bicycle/pedestrian path that will extend from Dunbar Township to Point Marion Borough at the Pennsylvania/West Virginia state line. The intent of this study update is to utilize and update the 1999 Feasibility Study as necessary based on changes to the trail corridor that have occurred in the past 18 years.
posted Jul 30, 2020
by Vanasse Hangen Brustlin, Inc.
This feasibility study examined the development of a multi-use rail with trail along the State-owned railroad, as well as a number of alternate routes. This study does not recommend specific routes, but highlights the possibilities for further consideration by the involved individuals and communities.
posted Jul 28, 2020
A detailed feasibility study for Mud Creek Greenway done in 2021.
posted Jun 5, 2019
by Mike Halferty with City of Toronto - Urban Foresty Branch
This poster session presentation summarizes the process of developing the City of Toronto's Natural Environment Trails Strategy and its outcomes.
posted Apr 11, 2019
The purpose of this trail study is to investigate the feasibility of building a trail system that connects Jean and the I-15 corridor to the small rural town of Goodsprings and the historic alignment of the yellow Pine Railroad.
posted Dec 31, 2018
A 1966 study headed by Stuart Udall on the feasibility of a National Trails System
posted May 3, 2018
This report sorts through the various choices for the most "economical and sustainable" types of trail surfacing options along the proposed Rio Grande Trail corridor from Belen to Sunland Park, New Mexico.
posted May 3, 2018
The objective of this study was to determine the type of pathway that would best satisfy the needs of the Village of Hoosick community.