posted Aug 5, 2020
by University of Colorado Denver, College of Architecture and Planning
This art master plans strive to identify the vision and future direction for public art in communities and to establish goals and action steps to implement the vision.
posted Jul 22, 2020
TRACS is an organized approach for collecting and updating field data on trail conditions and the work needed to meet standard.
posted Feb 19, 2018
by Allison Jones with Florida Fish and Wildlife Conservation Commission, Jamie Rae Walker, Ph.D Texas A&M Extension
This presentation will focus on the key components of trail user count methodologies.
posted Apr 4, 2019
by California State Parks, Statewide Trails Section
A trail bridge is a structure along a trail that spans over a waterway, precipitous slope, or other unstable ground that cannot support trail construction. Typically, a trail bridge is longer than a single span puncheon or boardwalk. If the height from the deck of the bridge to the ground or watercourse channel below is 48 inches or more, railings are required for safety. In addition to horizontal railings, a mid-rail or diagonal mid-rail is also necessary for edge protection.
posted May 3, 2022
This manual was created to accompany the Crew Leader training program developed by the Ozark Trail Association (OTA). It serves as an aid to volunteer Crew Leaders working with other volunteers to build and maintain single-track natural surface trails in the Ozarks region of Missouri. This manual is designed to serve as a baseline for trail construction and maintenance and as an introduction to leading small groups of volunteers on natural surface trail construction and maintenance events.
posted Mar 3, 2018
by New York - New Jersey Trail Conference
This project identifies trail maintenance needs to be addressed by NY-NJ Trail Conference volunteer trail crews.
posted Jan 24, 2018
An updated edition of the industry standard, "Trail Construction and Maintenance Notebook," first released in 1996.
posted Jun 5, 2019
by Margie Tatro with Reineke Construction
In this session learn about a simple, cost estimating tool and key factors associated with trail construction costs.
posted Dec 5, 2019
Specific skills used in trails and greenways work: construction of trails; construction of various trail elements; construction of trailheads and related facilities.
posted May 3, 2018
The objectives of the Missouri Riverfront Trail project are bringing people together, protecting natural resources, and enhancing the wellness and vitality of Platte County citizens and the region.
posted Oct 4, 2023
by Coalition for the Upper South Platte
The 2002 Hayman Fire grossly affected Trail Creek, a tributary to the South Platte River, with a concomitant increase of sediment yield, increases in significant flood events, and reduced habitat quality.
posted Jul 15, 2022
For trails to be considered “sustainable” they must meet these recreational needs while providing adequate protection to the environment while minimizing trail maintenance.
Page 112 of 132