Resource Library:

Trail Amenities / Structures

  Back to Design and Building

select all



published Sep 1, 2009

Hollow Rock Access Area Master Plan

The planned Hollow Rock Access Area is a multi-jurisdictional project to conserve significant natural and cultural resource lands along New Hope Creek and to make portions of the site available for low-impact recreational uses.


published Sep 1, 2007

Historical and Interpretation Study, Trail of Tears National Historic Trail

by U.S. Fish & Wildlife Service

The purpose of this study is to provide baseline historical information pertaining to those portions of the Trail of Tears National Historic Trail that cross onto lands managed by the FWS at the White River National Wildlife Refuge (NWR) in Arkansas, the Wheeler NWR in Alabama, and the Tennessee NWR in Tennessee.


published Sep 1, 2012

Lewis and Clark National Historic Trail Foundation Document

by National Park Service

Every unit of the national park system is required to have a formal statement of its core mission that will provide basic guidance for all planning and management decisions—a foundation for planning and management. The development of a foundation document for the Lewis and Clark National Historic Trail is necessary to effectively manage the park over the long term and protect park resources and values that are integral to the purpose and identity of the park unit.


published Dec 1, 2014

Appalachian National Scenic Trail Foundation Document

by National Park Service

The core components of this foundation document include a brief description of the Appalachian National Scenic Trail, the nature and purposes of the Appalachian National Scenic Trail, significance statements, fundamental resources and values, and interpretive themes. These components are core because they typically do not change over time. Core components are expected to be used in future planning and management efforts.


published Jul 1, 1977

El Camino Real National Scenic Trail Study

by U.S. Department of the Interior

This study has been prepared and trail recommendations made to meet the requirements of Public Law 90-543. The 1969 El Camino Real Feasibility Study concluded that sufficient documentation of historic, scenic, natural, and cultural significance did exist to warrant further study. This study will present recommendations based on an evaluation of the field study findings.


published May 13, 2020

Submit Your Trail Infrastructure Projects for CARES Act Funding

by Liz Thorstensen with Rails-to-Trails Conservancy (RTC)

The Coronavirus Aid, Relief, and Economic Security (CARES) Act, signed into law by President Donald J. Trump on March 27, 2020, provides the Economic Development Administration (EDA) with $1.5 billion for economic development assistance programs to strengthen communities.


posted Dec 5, 2019

National Scenic and Historic Trails Training Needs Assessment

by Elvin Clapp with Bureau of Land Management

Survey of skills and competencies to assist in developing a national training strategy for National Scenic and Historic Trails


published Apr 1, 2014

Continental Divide National Scenic Trail Trailhead Design Guidelines

This document provides guidelines to help managers make decisions in a sustainable manner for major trailheads all along the CDNST. Overall principles given here relate to all trailhead sites. However, they also include more detailed guidelines specific to the highly varied settings along the Continental Divide.


published Dec 1, 2007

Equestrian Design Guidebook for Trails, Trailheads, and Campgrounds

by Jan Hancock with Hancock Resources LLC, Federal Highway Administration, USDA Forest Service

This guidebook provides practical guidelines for developing recreation environments that are sensitive to the needs of riders and their stock.


Results from the Business Directory


Belson Outdoors, Inc.

Naperville, Illinois

Belson Outdoors, Your Outdoor Superstore®, is proud to be serving the needs of the park and recreation industry since 1948. Our product specialties include commercial barbecue grills, picnic tables, park benches, and tra...


627 Amersale Drive, Naperville, Illinois 60563
Toll Free: (800) 323-5664 | Main: (630) 897-8489 • [email protected]

Anchor Industries, Inc.

Evansville, Indiana

Tent, awning, shade and pool cover manufacturer.


Corporate Headquarters: 7701 Highway 41 N, Evansville, Indiana 47725
(800) 544-4445

Biological Mediation Systems LLC

Fort Collins, Colorado

We are a custom manufacturer of Prefabricated Restrooms, Concession Buildings, Park Entry Stations and Utility Buildings.


PO Box 650 | 2625 Redwing Rd Ste 110, Fort Collins, Colorado 80522
(970) 221-5949 • [email protected]

More...