Mid-block Shared-Use Path Crossings of Multilane Roadways in California
Successful shared-use paths offer a continuous and extended recreation and transportation experience. Avoiding vehicular interaction is a major challenge in urban environments where shared use paths intersect the roadway network on a regular basis. In the best cases, the paths are grade separated from roadway traffic with pedestrian bridges or under-crossings. However, geometric constraints, financial resources and incompatible adjacent land uses can require trail planners to contemplate and implement at-grade crossings.
by Rails-to-Trails Conservancy (RTC)
The focus of this report is these challenging at-grade crossings of multilane roadways at mid-block locations (but the report does not suggest that at-grade crossings are a suitable substitute for bridges and under-crossings where they are feasible and required to meet the trail system goals). The approximately 50 such at-grade crossings located in California exhibit a range of measures to reduce the potential of collisions and provide a good user experience. This brief overview of treatments is intended as an introduction for both planners and community members. For engineering design and construction of the crossings, in-depth resources listed in Appendix A can be consulted.
When required, the crossing of a busy multilane roadway should be as safe and convenient as possible. Where shared-use paths bisect major roadways, trail users want to continue on the path immediately across the roadway and desire to follow the most direct route to get there. Trail users have built-up momentum perpendicular to the roadway and perceive it as a barrier to rapid travel and the continuity of the trail experience.
Many urban shared-use paths follow former rail lines or channelized watercourses that intersect multilane roads well away from signalized intersections, and that often intersect at skewed angles that impact visibility. Crossing multiple lanes requires anticipation of gaps in traffic that can afford safe passage. On roadways with four or more lanes it becomes very difficult to predict if a vehicle will be coming in the far lane, especially for visually impaired or inexperienced trail users.
Published January 2011
Mountain Bike Trail Development: Guidelines for Successfully Managing the Process,” a 242-page “how to” manual covers modern trail development from trail types, to landscape analysis and design, to environmental and construction considerations, cost implications and more.
Equitable Access to Trails Discussed at 2023 International Trails Summit
If you will be joining us at the ITS in Reno NV April 17-20, 2023, don't miss these speakers and their sessions featuring topics related to equitable trails access.
Top 10 Requests for Trails and Outdoor Recreation Master Plans
Tony Boone and Jon Altschuld are both Board Members of the Professional TrailBuilders Association (PTBA), and both will be presenting at the 2023 American Trails/PTBA International Trails Summit. Their companies, Tony Boone Trails, and Chinook Landscape Architecture are Sierra-level sponsors for the conference.
County of Los Angeles Trails Manual
The purpose of this Trails Manual is to provide an accessible resource that can be used for trail planning, design, construction, and maintenance within the County of Los Angeles